Airport Link Line

The Airport Link Line of the Shanghai Suburban Railway opened on Dec 27, 2024.

Location:
The line has six entrances to Pudong Airport Terminal 1&2 Station and two entrances to South Wuzhou Road, North Wuzhou Road, and Middle Wuzhou Road, respectively.
The entrance to the Hongqiao Airport Terminal 2 Station of the Airport Link Line is located near Gates 11 and 12 on the departing floor and on the B1 level (near Metro Lines 2 and 10) of the Terminal 2 of Hongqiao International Airport.

Operating Hours:
The first train from Pudong Airport Terminal 1&2 Station departs at 6:00 am and the last train departs at 10:00 pm each day.
The first train from Hongqiao Airport Terminal 2 Station departs at 6:00 am and the last train departs at 10:00 pm each day.

Departure Interval: about 15 minutes.

Read, please close

Current location:Home > Information Disclosure > Media Center > News > Pudong International Airport embraces construction of T3
Pudong International Airport embraces construction of T3
Released:2024-11-27

Shanghai Pudong International Airport officially began the construction of its Terminal 3 on Nov 20, marking a significant milestone in its phase-IV expansion project.



A digital rendering of Terminal 3 at Shanghai Pudong International Airport. [Photo/WeChat ID: gh_01c0f79320c5]


After the phase-IV expansion project is completed in 2028, it is expected to help further enhance interconnectivity in the Yangtze River Delta region, better cater to the public's demand for high-quality transportation, and support the long-term development and operation of airlines. It will cover a combined terminal area of over 1.7 million square meters.


Located south of Terminals 1, 2, and the satellite terminal, Terminal 3 is designed to handle 50 million passenger trips. The outline of the buildings echoes the design of the existing terminals, representing the spirit and character of Shanghai's modern transportation hub.


To minimize transfer times for the passengers, the two main buildings of Terminal 3 will be connected by an X-shaped corridor. Walking distance from the security check to the gates will be about 6-8.5 minutes. Ninety contact stands, including 31 convertible ones, will be set up in the terminal, ranking it first among domestic airports.


Other highlights of the new terminal include smart technology, low-carbon design, and a pleasant ecological environment. Passengers will be able to enjoy full self-service check-in, baggage consignment, security check, and boarding services. Domestic passengers exiting the country will have the option of going through customs via facial recognition.